Promotional feature
Alliance Leisure - Design & Build part 10

The design and build stages of a project can be, potentially, the most bumpy. Alliance Leisure business development managers James Foley and Julia Goddard share how they helped smooth the way for clients in Doncaster and Cwmbran


How is the process managed?
From the start, Alliance works to develop the scheme concepts affordably and innovatively with the client and our property consultants Savernake Property, and other contractors. This is very different to other approaches where design and build outcomes can’t be delivered because only one contractor was involved at the start.

How does the design and build process begin?
Alliance has a unique approach and works with clients from the start and at every step until the project is delivered successfully. As Business Development Manager this involves establishing the project is viable before thinking about how that concept might look. We’ll look to increase participation by adapting, reinvigorating or in cases such as Adwick Leisure Centre in Doncaster, totally transforming an underutilised space to create something different but relevant to users.

What was the brief a Adwick? Doncaster Culture and Leisure Trust (DCLT) wanted to explore options for increasing fitness provision at the site and improving the overall centre offering – looking at the facility catchment and competition – such as the introduction of new academy sports hall facilities. Our design team created a journey through the site with three distinct areas which all feel like they belong. Where the sports hall used to be, there is a new ‘family adventure’ area at ground level, with ten pin bowling, café, bar and play facilities. Upstairs there is a newly formed mezzanine ‘fitness’ area, with a space for large scale fitness fitted out by DCLT, along with studio provision and changing rooms, and the modernised reception leads through to the pool.

What about changes at the design and build stages?
Alliance works with the client to create a vision and design the project. As the build commences the vision on paper or a 3D model can look different to the real thing. We can adapt the design and change the build while ensuring that the total project cost is still maintained.

How are challenges along the way overcome?
No build project ever runs perfectly smoothly, but commissioning surveys and expertise at the start helps us avoid risks where possible. With issues that would normally fall outside of our remit, we work with the client to see how we could cost effectively integrate these into the project. For instance at Adwick Leisure Centre, putting in new ten pin bowling, 100 stations of gym equipment and new infrastructure will add power requirements to the site. Instead of paying for an expensive new supply, we gave Doncaster Leisure Trust the option to work creatively with our team to use energy saving techniques, avoiding unnecessary cost and keeping energy performance within existing limits.

What marks the end of the design and build process?
The end of the process for Alliance doesn’t stop when the build is complete. We then ensure a robust handover takes place and work with partners to train staff to operate elements, such as the bowling at Adwick. We work hard to resolve late snags, and are proud that our repeat project rate with clients is high – a testament to us having clients’ interests as our number one priority.

Follow the series
To view the whole series of articles on Alliance Leisure’s offering, visit: www.healthclubmanagement.co.uk/allianceleisure

1. Scoping/investigation
2. Conceptualisation
3. Viability assessment
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)
10. Design & Build

CASE STUDY

Cwmbran Stadium, Torfaen Leisure Trust

Alliance Leisure recently redesigned and converted Cwmbran Stadium’s four­-court sports hall into its newly branded ‘Go Vertical’ activity zone, including an 18 element VerTgo climbing area, large soft play and cafe. The main reception and atrium were also modernised and the old café was converted to a 75­-station fitness suite. The outdoor grass pitch is also being converted to a 3G surface. Sally Church, chief executive officer of Torfaen Leisure Trust (TLT) says: “The project was designed with us to suit our requirements. We wanted a project that would generate income and increase participation, and would also look very different, not municipal.”

Alliance Leisure worked with operators Torfaen Leisure Trust and the design team consisting of Createability for construction and Bicknell Shacklady Ewing for interior design. During designing, the design team had to solve the problem of a low ceiling in the former cafe area, which was to be converted into a fitness suite. “Instead of making major structural changes, we designed and created the suite around the ceiling height and planned the space accordingly,” says Julia Goddard, business development manager for Alliance Leisure. “It now has 75 stations with wide windows facing out on to the track, giving lots of natural light.”

Goddard adds: “During the build, issues with the location of the Go Vertical climbing briefing area were found, so rather than spend additional money to sort this out we took a week as a team to solve the problem and ended up locating the briefing area into the main activity space, which has worked really positively and saved costs of around £20,000.”

“Every issue or problem we have come across has been resolved,” adds Church. “The whole process has worked because we all took a ‘solutions not problems approach.’ Now we are working with Alliance on sales and marketing for both the gym and the Go Vertical climbing area.”

 



Cwmbran Stadium’s old sports hall has been converted into an 18-element VerTgo climbing centre
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 

Find out more:
www.allianceleisure.co.uk
Tel: +44 (0)1278 444944

The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
FEATURED SUPPLIERS

Meet Desert Therapy: Aromatherapy Associates' first new blend in seven years
There is a particular quality of stillness found only in the desert. [more...]

Embrace the chill: TechnoAlpin's Snowsky revolutionises post-fitness recovery with falling snow
In the fast-paced world of fitness and wellness, where high-intensity workouts push us to our limits and the sweat pours, the importance of efficient recovery cannot be overstated. [more...]
+ More featured suppliers  
COMPANY PROFILES
Subtle Energies

With 30 years of clinical research, Subtle Energies is widely recognised for its authentic wellness [more...]
Unbescheiden GmbH

Unbescheiden GmbH was founded in 1869 in Baden- Baden, Germany [more...]
+ More profiles  
CATALOGUE GALLERY
 

+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

21-23 Jun 2026

Spa Life International (UK)

Midlands (Venue TBA), Liphook, United Kingdom
22-22 Jun 2026

World Bathing Day

Worldwide,
+ More diary  
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
SPA BUSINESS
SPA OPPORTUNITIES
SPA BUSINESS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Uniting the world of spa & wellness
Get Spa Business and Spa Business insider digital magazines FREE
Sign up here ▸
News   Products   Magazine   Subscribe
Promotional feature
Alliance Leisure - Design & Build part 10

The design and build stages of a project can be, potentially, the most bumpy. Alliance Leisure business development managers James Foley and Julia Goddard share how they helped smooth the way for clients in Doncaster and Cwmbran


How is the process managed?
From the start, Alliance works to develop the scheme concepts affordably and innovatively with the client and our property consultants Savernake Property, and other contractors. This is very different to other approaches where design and build outcomes can’t be delivered because only one contractor was involved at the start.

How does the design and build process begin?
Alliance has a unique approach and works with clients from the start and at every step until the project is delivered successfully. As Business Development Manager this involves establishing the project is viable before thinking about how that concept might look. We’ll look to increase participation by adapting, reinvigorating or in cases such as Adwick Leisure Centre in Doncaster, totally transforming an underutilised space to create something different but relevant to users.

What was the brief a Adwick? Doncaster Culture and Leisure Trust (DCLT) wanted to explore options for increasing fitness provision at the site and improving the overall centre offering – looking at the facility catchment and competition – such as the introduction of new academy sports hall facilities. Our design team created a journey through the site with three distinct areas which all feel like they belong. Where the sports hall used to be, there is a new ‘family adventure’ area at ground level, with ten pin bowling, café, bar and play facilities. Upstairs there is a newly formed mezzanine ‘fitness’ area, with a space for large scale fitness fitted out by DCLT, along with studio provision and changing rooms, and the modernised reception leads through to the pool.

What about changes at the design and build stages?
Alliance works with the client to create a vision and design the project. As the build commences the vision on paper or a 3D model can look different to the real thing. We can adapt the design and change the build while ensuring that the total project cost is still maintained.

How are challenges along the way overcome?
No build project ever runs perfectly smoothly, but commissioning surveys and expertise at the start helps us avoid risks where possible. With issues that would normally fall outside of our remit, we work with the client to see how we could cost effectively integrate these into the project. For instance at Adwick Leisure Centre, putting in new ten pin bowling, 100 stations of gym equipment and new infrastructure will add power requirements to the site. Instead of paying for an expensive new supply, we gave Doncaster Leisure Trust the option to work creatively with our team to use energy saving techniques, avoiding unnecessary cost and keeping energy performance within existing limits.

What marks the end of the design and build process?
The end of the process for Alliance doesn’t stop when the build is complete. We then ensure a robust handover takes place and work with partners to train staff to operate elements, such as the bowling at Adwick. We work hard to resolve late snags, and are proud that our repeat project rate with clients is high – a testament to us having clients’ interests as our number one priority.

Follow the series
To view the whole series of articles on Alliance Leisure’s offering, visit: www.healthclubmanagement.co.uk/allianceleisure

1. Scoping/investigation
2. Conceptualisation
3. Viability assessment
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)
10. Design & Build

CASE STUDY

Cwmbran Stadium, Torfaen Leisure Trust

Alliance Leisure recently redesigned and converted Cwmbran Stadium’s four­-court sports hall into its newly branded ‘Go Vertical’ activity zone, including an 18 element VerTgo climbing area, large soft play and cafe. The main reception and atrium were also modernised and the old café was converted to a 75­-station fitness suite. The outdoor grass pitch is also being converted to a 3G surface. Sally Church, chief executive officer of Torfaen Leisure Trust (TLT) says: “The project was designed with us to suit our requirements. We wanted a project that would generate income and increase participation, and would also look very different, not municipal.”

Alliance Leisure worked with operators Torfaen Leisure Trust and the design team consisting of Createability for construction and Bicknell Shacklady Ewing for interior design. During designing, the design team had to solve the problem of a low ceiling in the former cafe area, which was to be converted into a fitness suite. “Instead of making major structural changes, we designed and created the suite around the ceiling height and planned the space accordingly,” says Julia Goddard, business development manager for Alliance Leisure. “It now has 75 stations with wide windows facing out on to the track, giving lots of natural light.”

Goddard adds: “During the build, issues with the location of the Go Vertical climbing briefing area were found, so rather than spend additional money to sort this out we took a week as a team to solve the problem and ended up locating the briefing area into the main activity space, which has worked really positively and saved costs of around £20,000.”

“Every issue or problem we have come across has been resolved,” adds Church. “The whole process has worked because we all took a ‘solutions not problems approach.’ Now we are working with Alliance on sales and marketing for both the gym and the Go Vertical climbing area.”

 



Cwmbran Stadium’s old sports hall has been converted into an 18-element VerTgo climbing centre
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 

Find out more:
www.allianceleisure.co.uk
Tel: +44 (0)1278 444944

The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
LATEST NEWS
Protests continue in Albania against US$1.6 billion luxury resort backed by Jared Kushner and Ivanka Trump
Mass protests have been taking place since Monday 1 June in Albania over the development of a luxury resort by Donald Trump’s daughter Ivanka Trump and her husband Jared Kushner.
Barons Eden rebrands to Hiddenwell ahead of spa hotel portfolio expansion
Barons Eden, the UK parent company that operates luxury destination properties in England, has rebranded to become Hiddenwell.
Belgin Aksoy marks 15 years of Global Wellness Day
Global Wellness Day (GWD) marked its 15th anniversary on Saturday 13 June 2026, with the theme: #JoyMagenta – a celebration of the healing qualities of simple gestures and activities that spark joy.
HUM2N launches longevity clinic at Six Senses London
Global luxury hospitality brand, Six Senses, has partnered with longevity healthcare provider, HUM2N, to launch a clinic at Six Senses London, at The Whiteley.
Mayrlife opens first hotel day clinic in partnership with Rosewood Vienna
As part of its first hotel partnership, Mayrlife – the medical health resort company known for its site in Altaussee, Austria – has launched a day clinic at the Rosewood Vienna.
KX Chelsea invests £15 million to upgrade its wellness offering
Premium London health club, KX Chelsea, will imminently unveil its most significant redevelopment since its launch in 2002 to create an integrated wellness model combining training, recovery and relaxation.
Rosewood Le Guanahani St Barth offers ocean-themed yoga for Global Wellness Day
Rosewood Le Guanahani St Barth, on the northeast coast of Saint Barthélemy in the French West Indies, is offering a programme of ocean-inspired yoga classes between 8-14 June to celebrate Global Wellness Day (GWD).
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
Hoshino Resorts combats summer heat with medically-supervised cool bathing programme for KAI onsen
Hoshino Resorts has developed a “Cool-down onsen soak” programme at properties with Japanese onsen facilities – those within the company’s KAI brand.
Rainforest immersion and mindfulness are on offer at The Ritz-Carlton, Langkawi, for Global Wellness Day
The Ritz-Carlton, Langkawi, in Malaysia, has revealed a schedule for Global Wellness Day (GWD) that includes guided rainforest walks, mindful movement and guided coastal meditation experiences.
Longevitix launches AI-powered platform to deliver longevity medicine at scale
Longevitix, a clinical platform for preventive and longevity medicine, has launched its AI- powered intelligence system to help physicians deliver continuous, personalised longevity- focused care at scale.
Atmantan Wellness Centre announces new wellness destination in Hyderabad
Atmantan Wellness Centre, an integrative wellness destination in Mulshi, near Pune in India, is expanding its portfolio by adding a new centre in Hyderabad that will launch between 2028 and 2029.
+ More news   
 
FEATURED SUPPLIERS

Meet Desert Therapy: Aromatherapy Associates' first new blend in seven years
There is a particular quality of stillness found only in the desert. [more...]

Embrace the chill: TechnoAlpin's Snowsky revolutionises post-fitness recovery with falling snow
In the fast-paced world of fitness and wellness, where high-intensity workouts push us to our limits and the sweat pours, the importance of efficient recovery cannot be overstated. [more...]
+ More featured suppliers  
COMPANY PROFILES
Subtle Energies

With 30 years of clinical research, Subtle Energies is widely recognised for its authentic wellness [more...]
+ More profiles  
CATALOGUE GALLERY
+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

21-23 Jun 2026

Spa Life International (UK)

Midlands (Venue TBA), Liphook, United Kingdom
22-22 Jun 2026

World Bathing Day

Worldwide,
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS