Alliance Leisure - Design & Build part 10

The design and build stages of a project can be, potentially, the most bumpy. Alliance Leisure business development managers James Foley and Julia Goddard share how they helped smooth the way for clients in Doncaster and Cwmbran


How is the process managed?
From the start, Alliance works to develop the scheme concepts affordably and innovatively with the client and our property consultants Savernake Property, and other contractors. This is very different to other approaches where design and build outcomes can’t be delivered because only one contractor was involved at the start.

How does the design and build process begin?
Alliance has a unique approach and works with clients from the start and at every step until the project is delivered successfully. As Business Development Manager this involves establishing the project is viable before thinking about how that concept might look. We’ll look to increase participation by adapting, reinvigorating or in cases such as Adwick Leisure Centre in Doncaster, totally transforming an underutilised space to create something different but relevant to users.

What was the brief a Adwick? Doncaster Culture and Leisure Trust (DCLT) wanted to explore options for increasing fitness provision at the site and improving the overall centre offering – looking at the facility catchment and competition – such as the introduction of new academy sports hall facilities. Our design team created a journey through the site with three distinct areas which all feel like they belong. Where the sports hall used to be, there is a new ‘family adventure’ area at ground level, with ten pin bowling, café, bar and play facilities. Upstairs there is a newly formed mezzanine ‘fitness’ area, with a space for large scale fitness fitted out by DCLT, along with studio provision and changing rooms, and the modernised reception leads through to the pool.

What about changes at the design and build stages?
Alliance works with the client to create a vision and design the project. As the build commences the vision on paper or a 3D model can look different to the real thing. We can adapt the design and change the build while ensuring that the total project cost is still maintained.

How are challenges along the way overcome?
No build project ever runs perfectly smoothly, but commissioning surveys and expertise at the start helps us avoid risks where possible. With issues that would normally fall outside of our remit, we work with the client to see how we could cost effectively integrate these into the project. For instance at Adwick Leisure Centre, putting in new ten pin bowling, 100 stations of gym equipment and new infrastructure will add power requirements to the site. Instead of paying for an expensive new supply, we gave Doncaster Leisure Trust the option to work creatively with our team to use energy saving techniques, avoiding unnecessary cost and keeping energy performance within existing limits.

What marks the end of the design and build process?
The end of the process for Alliance doesn’t stop when the build is complete. We then ensure a robust handover takes place and work with partners to train staff to operate elements, such as the bowling at Adwick. We work hard to resolve late snags, and are proud that our repeat project rate with clients is high – a testament to us having clients’ interests as our number one priority.

Follow the series
To view the whole series of articles on Alliance Leisure’s offering, visit: www.healthclubmanagement.co.uk/allianceleisure

1. Scoping/investigation
2. Conceptualisation
3. Viability assessment
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)
10. Design & Build

CASE STUDY

Cwmbran Stadium, Torfaen Leisure Trust

Alliance Leisure recently redesigned and converted Cwmbran Stadium’s four­-court sports hall into its newly branded ‘Go Vertical’ activity zone, including an 18 element VerTgo climbing area, large soft play and cafe. The main reception and atrium were also modernised and the old café was converted to a 75­-station fitness suite. The outdoor grass pitch is also being converted to a 3G surface. Sally Church, chief executive officer of Torfaen Leisure Trust (TLT) says: “The project was designed with us to suit our requirements. We wanted a project that would generate income and increase participation, and would also look very different, not municipal.”

Alliance Leisure worked with operators Torfaen Leisure Trust and the design team consisting of Createability for construction and Bicknell Shacklady Ewing for interior design. During designing, the design team had to solve the problem of a low ceiling in the former cafe area, which was to be converted into a fitness suite. “Instead of making major structural changes, we designed and created the suite around the ceiling height and planned the space accordingly,” says Julia Goddard, business development manager for Alliance Leisure. “It now has 75 stations with wide windows facing out on to the track, giving lots of natural light.”

Goddard adds: “During the build, issues with the location of the Go Vertical climbing briefing area were found, so rather than spend additional money to sort this out we took a week as a team to solve the problem and ended up locating the briefing area into the main activity space, which has worked really positively and saved costs of around £20,000.”

“Every issue or problem we have come across has been resolved,” adds Church. “The whole process has worked because we all took a ‘solutions not problems approach.’ Now we are working with Alliance on sales and marketing for both the gym and the Go Vertical climbing area.”

 



Cwmbran Stadium’s old sports hall has been converted into an 18-element VerTgo climbing centre
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 

Find out more:
www.allianceleisure.co.uk
Tel: +44 (0)1278 444944

The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
FEATURED SUPPLIERS

Introducing Silent Loads: Wildsmith’s newest advancement in personalised wellbeing
In a world where imbalance often accumulates quietly, Wildsmith unveils its newest wellbeing innovation: Silent Loads, an approach designed to meet the needs of modern spa guests with precision and depth. [more...]

Longevity in spas: a strategic choice, not a default setting
Longevity has become one of the most debated concepts in contemporary wellness. [more...]
+ More featured suppliers  
COMPANY PROFILES
TechnoAlpin Indoor

TechnoAlpin is the world leader for snowmaking systems. With the Indoor snow division, TechnoAlpin c [more...]
Wynne Business Consulting and Education

Wynne Business, founded in 1998, specialises in creating, growing and fine- tuning spas, salons, wel [more...]
+ More profiles  
CATALOGUE GALLERY
 

+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

09-11 Jun 2026

World Sauna Forum 2026

Savutuvan Apaja, Haapaniemi, Finland
09-12 Jun 2026

W3Spa EMEA

Hotel Cascais Miragem Health & Spa, Portugal
+ More diary  
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
SPA BUSINESS
SPA OPPORTUNITIES
SPA BUSINESS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Uniting the world of spa & wellness
Get Spa Business and Spa Business insider digital magazines FREE
Sign up here ▸
News   Products   Magazine   Subscribe
Promotional feature
Alliance Leisure - Design & Build part 10

The design and build stages of a project can be, potentially, the most bumpy. Alliance Leisure business development managers James Foley and Julia Goddard share how they helped smooth the way for clients in Doncaster and Cwmbran


How is the process managed?
From the start, Alliance works to develop the scheme concepts affordably and innovatively with the client and our property consultants Savernake Property, and other contractors. This is very different to other approaches where design and build outcomes can’t be delivered because only one contractor was involved at the start.

How does the design and build process begin?
Alliance has a unique approach and works with clients from the start and at every step until the project is delivered successfully. As Business Development Manager this involves establishing the project is viable before thinking about how that concept might look. We’ll look to increase participation by adapting, reinvigorating or in cases such as Adwick Leisure Centre in Doncaster, totally transforming an underutilised space to create something different but relevant to users.

What was the brief a Adwick? Doncaster Culture and Leisure Trust (DCLT) wanted to explore options for increasing fitness provision at the site and improving the overall centre offering – looking at the facility catchment and competition – such as the introduction of new academy sports hall facilities. Our design team created a journey through the site with three distinct areas which all feel like they belong. Where the sports hall used to be, there is a new ‘family adventure’ area at ground level, with ten pin bowling, café, bar and play facilities. Upstairs there is a newly formed mezzanine ‘fitness’ area, with a space for large scale fitness fitted out by DCLT, along with studio provision and changing rooms, and the modernised reception leads through to the pool.

What about changes at the design and build stages?
Alliance works with the client to create a vision and design the project. As the build commences the vision on paper or a 3D model can look different to the real thing. We can adapt the design and change the build while ensuring that the total project cost is still maintained.

How are challenges along the way overcome?
No build project ever runs perfectly smoothly, but commissioning surveys and expertise at the start helps us avoid risks where possible. With issues that would normally fall outside of our remit, we work with the client to see how we could cost effectively integrate these into the project. For instance at Adwick Leisure Centre, putting in new ten pin bowling, 100 stations of gym equipment and new infrastructure will add power requirements to the site. Instead of paying for an expensive new supply, we gave Doncaster Leisure Trust the option to work creatively with our team to use energy saving techniques, avoiding unnecessary cost and keeping energy performance within existing limits.

What marks the end of the design and build process?
The end of the process for Alliance doesn’t stop when the build is complete. We then ensure a robust handover takes place and work with partners to train staff to operate elements, such as the bowling at Adwick. We work hard to resolve late snags, and are proud that our repeat project rate with clients is high – a testament to us having clients’ interests as our number one priority.

Follow the series
To view the whole series of articles on Alliance Leisure’s offering, visit: www.healthclubmanagement.co.uk/allianceleisure

1. Scoping/investigation
2. Conceptualisation
3. Viability assessment
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)
10. Design & Build

CASE STUDY

Cwmbran Stadium, Torfaen Leisure Trust

Alliance Leisure recently redesigned and converted Cwmbran Stadium’s four­-court sports hall into its newly branded ‘Go Vertical’ activity zone, including an 18 element VerTgo climbing area, large soft play and cafe. The main reception and atrium were also modernised and the old café was converted to a 75­-station fitness suite. The outdoor grass pitch is also being converted to a 3G surface. Sally Church, chief executive officer of Torfaen Leisure Trust (TLT) says: “The project was designed with us to suit our requirements. We wanted a project that would generate income and increase participation, and would also look very different, not municipal.”

Alliance Leisure worked with operators Torfaen Leisure Trust and the design team consisting of Createability for construction and Bicknell Shacklady Ewing for interior design. During designing, the design team had to solve the problem of a low ceiling in the former cafe area, which was to be converted into a fitness suite. “Instead of making major structural changes, we designed and created the suite around the ceiling height and planned the space accordingly,” says Julia Goddard, business development manager for Alliance Leisure. “It now has 75 stations with wide windows facing out on to the track, giving lots of natural light.”

Goddard adds: “During the build, issues with the location of the Go Vertical climbing briefing area were found, so rather than spend additional money to sort this out we took a week as a team to solve the problem and ended up locating the briefing area into the main activity space, which has worked really positively and saved costs of around £20,000.”

“Every issue or problem we have come across has been resolved,” adds Church. “The whole process has worked because we all took a ‘solutions not problems approach.’ Now we are working with Alliance on sales and marketing for both the gym and the Go Vertical climbing area.”

 



Cwmbran Stadium’s old sports hall has been converted into an 18-element VerTgo climbing centre
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 

Find out more:
www.allianceleisure.co.uk
Tel: +44 (0)1278 444944

The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
LATEST NEWS
Four Seasons Resort The Nam Hai creates Global Wellness Day programme rooted in nature
Four Seasons Resort The Nam Hai in Hoi An, Vietnam, has put together a Global Wellness Day (GWD) agenda with activations rooted in nature and shaped by four pillars of Joy – in alignment with the day’s theme #JoyMagenta.
Wellness care hospital opens in Vilnius with innovative spa and hospitality concept
Lithuanian care operator Addere Care has launched a new “wellness care hospital” in Vilnius.
Rainer Maelzer joins Therme Group as chief entertainment officer
Rainer Maelzer, an experiential entertainment innovator, has been appointed chief entertainment officer by Therme Group.
Global Wellness Summit announces 2026 theme: the science, art and soul of wellness
The Global Wellness Summit (GWS) will celebrate its 20th anniversary at the 2026 event in Phuket, Thailand, later this year with the theme: The Science, Art and Soul of Wellness.
All-inclusive eco-wellness development Auko to open near Vietnam’s Son Doong caves
Auko, an all-inclusive development, is opening in Phong Nha in Vietnam in Q3 2026, with a series of 30 tented eco-lodges and wellness hospitality operations by Lumina Wellbeing.
Therme Manchester reveals 90:90 strategy – 90 per cent of the UK population within a 90-minute drive of a Therme
Therme Manchester’s 28-acre development, which will include interconnected glass pavilions that measure 65,000sq m, will be the largest bathing and wellbeing attraction in the world once complete, according to prof David Russell, CEO of Therme UK. 
Four Seasons’ Naples Beach Club opens 2,800sq m Sanctuary spa inspired by indigenous Calusa people
Naples Beach Club, a Four Seasons Resort, has opened a 2,800sq m spa called The Sanctuary, with the design and concept inspired by the Native American people that populated Florida’s Southwest coast – the Calusa.
Swire Hotels’ Upper House unveils House of Healing wellness programme rollout
Swire Hotels’ luxury hospitality brand Upper House has revealed it will roll out its two-day House of Healing retreats at its three hotels in Hong Kong, Chengdu and Shanghai.
Guerlain to open up to five spas with handpicked partners a year, says Diane Davody
LVMH-owned beauty house Guerlain will launch up to five spas with partners a year as part of its plan to expand globally, according to the brand’s international spa and wellness director, Diane Davody.
More than half of consumers reject leading wellness resort brands
A new global study by Kevin Kelly and Peter Yesawich, called WELLSurvey 2.0, has revealed more than half of consumers in the UK, US and Germany would not choose numerous high- profile wellness resort brands for a future trip.
Longevity and hospitality in the spotlight at FIBO workshop
Wellness and hospitality thought leaders gathered recently for a workshop at Yasuragi, the Japanese spa and conference hotel near Stockholm.
Jeremy McCarthy launches industry intelligence platform, Leisure Alchemy
Luxury hospitality and wellness pioneer Jeremy McCarthy has launched Leisure Alchemy, a digital platform that will provide professionals with strategic guidance on how to build transformational leisure experiences that drive profit.
+ More news   
 
FEATURED SUPPLIERS

Introducing Silent Loads: Wildsmith’s newest advancement in personalised wellbeing
In a world where imbalance often accumulates quietly, Wildsmith unveils its newest wellbeing innovation: Silent Loads, an approach designed to meet the needs of modern spa guests with precision and depth. [more...]

Longevity in spas: a strategic choice, not a default setting
Longevity has become one of the most debated concepts in contemporary wellness. [more...]
+ More featured suppliers  
COMPANY PROFILES
TechnoAlpin Indoor

TechnoAlpin is the world leader for snowmaking systems. With the Indoor snow division, TechnoAlpin c [more...]
+ More profiles  
CATALOGUE GALLERY
+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

09-11 Jun 2026

World Sauna Forum 2026

Savutuvan Apaja, Haapaniemi, Finland
09-12 Jun 2026

W3Spa EMEA

Hotel Cascais Miragem Health & Spa, Portugal
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS