Latest
issue
GET SPA BUSINESS
magazine
Yes! Send me the FREE digital editions of Spa Business and Spa Business insider magazines and the FREE weekly Spa Business and Spa Business insider ezines and breaking news alerts!
Not right now, thanksclose this window I've already subscribed.
Uniting the world of spa & wellness
Get Spa Business and Spa Business insider digital magazines FREE
Sign up here ▸
News   Features   Products   Company profilesProfiles   Press releasesProfiles   Magazine   Handbook   Advertise    Subscribe  
NEWS
Kengo Kuma hits back in Tokyo 2020 stadium row
POSTED 15 Jan 2016 . BY Kim Megson
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
The architect developing Japan’s National Stadium for the Tokyo 2020 Olympic Games has publicly refuted claims his studio have copied from an earlier design submitted by Zaha Hadid Architects (ZHA).

According to the Japan Times newspaper, Kengo Kuma spoke at a news conference on 15 January in Tokyo to deny that significant similarities exist between the two designs for the stadium.

“I believe if you take a look at Zaha Hadid’s design and mine, you can see very different impressions of the building,” he is reported to have said.

ZHA – who are embroiled in a row with the Japan Sports Council (JSC) over its decision to drop them from the stadium project – have said that “remarkable similarities” exist between the stadium layout and seating bowl they proposed, and the one created by Kuma.

Yesterday (14 January) ZHA submitted a report to the JSC outlining these claims in detail. In a statement, the firm said the document “will form the basis for the discussions we hope to resume shortly with the JSC to resolve the important issue of the use of valuable design work that is currently the copyright of ZHA and the original design team.”

The studio also said it has received and rejected a written request from the JSC to hand over copyright for the design and sign a non-disclosure agreement in order to receive an overdue payment for its work on the project.

At the press conference, Kuma reportedly said similarities in design are inevitable when trying to create a seating configuration that can give 80,000 spectators a clear view. He added that his stadium is lower and flatter than ZHA’s design and uses different natural materials in a bit to minimise construction costs and integrate the stadium with its surroundings in the leafy Jingu Gaien area.

He also denied suggestions that ZHA were dropped from the project because they are a foreign studio. According to the Japan Times he added that “it is perhaps difficult for architects from other countries to work in Japan” due to the language barrier and the way in which meetings are conducted.

While the ¥149bn (£806m, US$1.2bn, €1.1bn) National Stadium is on course to be completed by November 2019, the row over its development threatens to overshadow the project.
RELATED STORIES
  Zaha Hadid refuses to hand over copyright to Tokyo 2020 stadium design


Zaha Hadid Architects (ZHA) have claimed the Japan Sports Council are withholding payment for the studio’s design for the Japan National Stadium in Tokyo unless the architects give up the copyright to the designs and sign a confidentiality clause.
  Zaha Hadid cries foul as Tokyo 2020 stadium design is chosen


Japanese architects Kengo Kuma have been selected to design the 80,000 capacity stadium which will be the centrepiece of the 2020 Olympics in Tokyo.
  Zaha Hadid Architects question Japanese government's logic for Olympic stadium designs


The architects of the original Tokyo 2020 Olympic stadium have accused the Japanese government of putting the legacy of the Games in jeopardy and overlooking several designers after it unveiled two new plans for the arena.
  Japan Sports Council unveils Olympic Stadium designs


Two stadium designs for the 2020 Tokyo Olympics have been revealed by the Japanese Sports Council.
MORE NEWS
One in three spa practitioners have considered leaving the industry due to concerns about their own wellbeing
A new survey of UK and international spa practitioners shows that stress, burnout and wellbeing concerns have caused one in three respondents to consider leaving the industry.
UK updates physical activity guidelines with focus on daily movement
The UK's four Chief Medical Officers have published a refreshed edition of Physical activity guidelines: UK Chief Medical Officers' report, updating the evidence that underpins the nation's physical activity recommendations and placing greater emphasis on strength, balance, reducing sedentary behaviour and, for the first time, supporting people taking weight loss medications.
Sauna advocate Becky Pelkonen drafts global public sauna-bathing charter
Becky Pelkonen, the sauna advocate and researcher, has unveiled the draft of a global public sauna-bathing charter.
Marriott International partners with Fitwel for wellness solutions across its residential portfolio
Marriott International has partnered with Fitwel, a healthy building certification system that aims to optimise occupant health.
+ More news   

FEATURED SUPPLIERS

Zerobody Cryo: Starpool's contrast therapy solution
Contrast therapy, based on the alternation of hot and cold rituals, has become one of the most valued practices in the fields of wellness and recovery. [more...]

Embrace the chill: TechnoAlpin's Snowsky revolutionises post-fitness recovery with falling snow
In the fast-paced world of fitness and wellness, where high-intensity workouts push us to our limits and the sweat pours, the importance of efficient recovery cannot be overstated. [more...]
+ More featured suppliers  
COMPANY PROFILES
Voya Organic Beauty

Voya Organic Beauty, founded in 2006 in Ireland by Mark Walton and Kira Guckian Walton, is a private [more...]
HPO.Tech Hyperbaric Systems

Founded in 2020 in Istanbul, HPO.Tech combines 15+ years of expertise in hyperbaric technology, divi [more...]
+ More profiles  
CATALOGUE GALLERY
 

+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
10-12 Sep 2026

ASEAN Patio Pool Spa Expo 2026

MITEC Kuala Lumpur,Malaysia, Malaysia
+ More diary  
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
SPA BUSINESS
SPA OPPORTUNITIES
SPA BUSINESS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Uniting the world of spa & wellness
Get Spa Business and Spa Business insider digital magazines FREE
Sign up here ▸
News   Products   Magazine   Subscribe
NEWS
Kengo Kuma hits back in Tokyo 2020 stadium row
POSTED 15 Jan 2016 . BY Kim Megson
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
The architect developing Japan’s National Stadium for the Tokyo 2020 Olympic Games has publicly refuted claims his studio have copied from an earlier design submitted by Zaha Hadid Architects (ZHA).

According to the Japan Times newspaper, Kengo Kuma spoke at a news conference on 15 January in Tokyo to deny that significant similarities exist between the two designs for the stadium.

“I believe if you take a look at Zaha Hadid’s design and mine, you can see very different impressions of the building,” he is reported to have said.

ZHA – who are embroiled in a row with the Japan Sports Council (JSC) over its decision to drop them from the stadium project – have said that “remarkable similarities” exist between the stadium layout and seating bowl they proposed, and the one created by Kuma.

Yesterday (14 January) ZHA submitted a report to the JSC outlining these claims in detail. In a statement, the firm said the document “will form the basis for the discussions we hope to resume shortly with the JSC to resolve the important issue of the use of valuable design work that is currently the copyright of ZHA and the original design team.”

The studio also said it has received and rejected a written request from the JSC to hand over copyright for the design and sign a non-disclosure agreement in order to receive an overdue payment for its work on the project.

At the press conference, Kuma reportedly said similarities in design are inevitable when trying to create a seating configuration that can give 80,000 spectators a clear view. He added that his stadium is lower and flatter than ZHA’s design and uses different natural materials in a bit to minimise construction costs and integrate the stadium with its surroundings in the leafy Jingu Gaien area.

He also denied suggestions that ZHA were dropped from the project because they are a foreign studio. According to the Japan Times he added that “it is perhaps difficult for architects from other countries to work in Japan” due to the language barrier and the way in which meetings are conducted.

While the ¥149bn (£806m, US$1.2bn, €1.1bn) National Stadium is on course to be completed by November 2019, the row over its development threatens to overshadow the project.
RELATED STORIES
Zaha Hadid refuses to hand over copyright to Tokyo 2020 stadium design


Zaha Hadid Architects (ZHA) have claimed the Japan Sports Council are withholding payment for the studio’s design for the Japan National Stadium in Tokyo unless the architects give up the copyright to the designs and sign a confidentiality clause.
Zaha Hadid cries foul as Tokyo 2020 stadium design is chosen


Japanese architects Kengo Kuma have been selected to design the 80,000 capacity stadium which will be the centrepiece of the 2020 Olympics in Tokyo.
Zaha Hadid Architects question Japanese government's logic for Olympic stadium designs


The architects of the original Tokyo 2020 Olympic stadium have accused the Japanese government of putting the legacy of the Games in jeopardy and overlooking several designers after it unveiled two new plans for the arena.
Japan Sports Council unveils Olympic Stadium designs


Two stadium designs for the 2020 Tokyo Olympics have been revealed by the Japanese Sports Council.
MORE NEWS
One in three spa practitioners have considered leaving the industry due to concerns about their own wellbeing
A new survey of UK and international spa practitioners shows that stress, burnout and wellbeing concerns have caused one in three respondents to consider leaving the industry.
UK updates physical activity guidelines with focus on daily movement
The UK's four Chief Medical Officers have published a refreshed edition of Physical activity guidelines: UK Chief Medical Officers' report, updating the evidence that underpins the nation's physical activity recommendations and placing greater emphasis on strength, balance, reducing sedentary behaviour and, for the first time, supporting people taking weight loss medications.
Sauna advocate Becky Pelkonen drafts global public sauna-bathing charter
Becky Pelkonen, the sauna advocate and researcher, has unveiled the draft of a global public sauna-bathing charter.
Marriott International partners with Fitwel for wellness solutions across its residential portfolio
Marriott International has partnered with Fitwel, a healthy building certification system that aims to optimise occupant health.
Anna Bjurstam steps down from Six Senses to build new company Wahayla
Anna Bjurstam has left her role as Wellness Pioneer at Six Senses Hotels and Resorts and launched a new wellness, longevity and “consciousness consultancy” called Wahayla.
Fairmont Cheshire, The Mere, opens with spa philosophy of ‘Wellness without Walls’
Fairmont Cheshire, The Mere, has opened today (10 July) in the Northwest of England with a 1,715sq m Fairmont Spa that has been designed using a ‘Wellness without Walls’ concept.
+ More news   
 
FEATURED SUPPLIERS

Zerobody Cryo: Starpool's contrast therapy solution
Contrast therapy, based on the alternation of hot and cold rituals, has become one of the most valued practices in the fields of wellness and recovery. [more...]

Embrace the chill: TechnoAlpin's Snowsky revolutionises post-fitness recovery with falling snow
In the fast-paced world of fitness and wellness, where high-intensity workouts push us to our limits and the sweat pours, the importance of efficient recovery cannot be overstated. [more...]
+ More featured suppliers  
COMPANY PROFILES
Voya Organic Beauty

Voya Organic Beauty, founded in 2006 in Ireland by Mark Walton and Kira Guckian Walton, is a private [more...]
+ More profiles  
CATALOGUE GALLERY
+ More catalogues  

DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
10-12 Sep 2026

ASEAN Patio Pool Spa Expo 2026

MITEC Kuala Lumpur,Malaysia, Malaysia
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS